KASQ › Tools › CPP compatibility
CPP compatibility
The main contractor's pack asks for things your RAMS has to answer. KASQ reads both and lists, point by point, what is covered, what is missing and what conflicts.
Part of the Company plan. Looking needs no account.
In the office
Upload the main contractor's construction phase plan and your RAMS. KASQ reads the pack and lists what it requires of your RAMS, then reads your RAMS and answers each point — covered, partly covered, missing, or in conflict — quoting the pack's passage and the RAMS passage it found, or saying that none was found. Rules that are not about your task are set aside and named, and so is anything it could not check, every time.
On site
What you take to site is a RAMS you have checked against the pack point by point, and a list of the points you chose to answer differently.
What it never does
It never approves a RAMS. That is a competent person's judgement and signature; this shortens the read, it does not replace it.
What it costs
Part of the Company plan (£99 a month, 10 people). One check counts as 25 of its 1500 questions a month — about 60 checks. All plans and prices →
The other tools
- Site advisor — An HSE advisor on every site
- Toolbox talks — From HSE guidance, in the crew's language
- RAMS review — A risk assessment and method statement, checked 12 ways
- COSHH assessment — From the product's safety data sheet
- Hand-arm vibration — A HAVS calculator on HSE's points
- Noise exposure — The day's noise added up HSE's way
- Dropped object risk — Weight and height in, the answer out
- Take 5 / POWRA — A point-of-work risk assessment
- Kit check — The site equipment register, scanned by QR
- Site register — Crew, certificates, the 3 Strikes board
- Site audit — A walk, photos, a PDF report
- Site signs — 85 signs, print and laminate