KASQ › Tools › COSHH assessment
COSHH assessment
Drop in the product's own safety data sheet. KASQ reads it, places the product in HSE's hazard group, and builds the assessment around the task you describe.
No card, no expiry. Looking needs no account — using does.
In the office
KASQ reads the parts of the data sheet that matter — the product, its composition, the hazards, the exposure controls and the physical properties — and checks every hazard code it found against the words on the sheet; a code it cannot find there stops the read. From those codes it puts the product in HSE's hazard group and, with how much you use and how dusty or volatile it is, works out the control approach exactly as the COSHH essentials tables do — a look-up, not an opinion, and the more cautious cell where the tables disagree.
Then you add the task: what is being done, where, by whom, how often and for how long, what controls are already there, and who is assessing. The sheet lists each constituent with its GB workplace exposure limit from EH40 where one is listed.
On site
The assessment is printed, in English, and kept where the product is used, with the data sheet beside it. It carries a line for the assessor and a line for the competent person who reviews and approves it — work starts after that signature, not before.
What it never does
It never replaces the safety data sheet and never signs the assessment off. A data sheet describes a substance; an assessment describes your job, and the task you type is all KASQ knows about your site.
It does not measure anybody's exposure and does not choose a respirator.
What it costs
One run counts as 10 of the Free plan's 30 questions a month — about 3 a month, free, no card. Two steps: reading the data sheet counts as 5, the assessment as 5 more. All plans and prices →
The other tools
- Site advisor — An HSE advisor on every site
- Toolbox talks — From HSE guidance, in the crew's language
- RAMS review — A risk assessment and method statement, checked 12 ways
- CPP compatibility — Your RAMS against the construction phase plan
- Hand-arm vibration — A HAVS calculator on HSE's points
- Noise exposure — The day's noise added up HSE's way
- Dropped object risk — Weight and height in, the answer out
- Take 5 / POWRA — A point-of-work risk assessment
- Kit check — The site equipment register, scanned by QR
- Site register — Crew, certificates, the 3 Strikes board
- Site audit — A walk, photos, a PDF report
- Site signs — 85 signs, print and laminate