How can I help?
Ask a construction safety question (Great Britain)
— plain English, typos and site slang are fine.
Ask a construction safety question (Great Britain)
— plain English, typos and site slang are fine.
Written from HSE guidance, with a sign-on sheet. Ready to print.
In the office. Name the task — the whole task, “welding from a scaffold”, not just the place. If you want, add a line on what is going on — who, what kit, where; leave it out and you get the general talk. KASQ writes the talk from checked GB guidance and, when it has nothing checked on that topic, says so instead of writing one. What comes back is yours to shape: put any point right in your own words, add a site photograph and move or enlarge it until it shows the thing you mean, add your logo, the company, who delivers it and when. Tick the crew’s languages — Polish, Romanian, Russian, Lithuanian, Bulgarian — and type how many people will sign. You read and edit the English page; the other languages and a sign-on sheet with a line per person appear in the file you print.
On site. The talk is given by a person, to a crew, and they sign the sheet in front of them. The sources the talk was written from are printed on that sheet, so whoever files it can see where every point came from.
It never delivers the talk and never records who was there. A signed sheet is a person’s word that they stood there and said it. And it never pads a talk: a topic the checked sources do not cover is refused, not filled in.
Upload a risk assessment and method statement — a RAMS — as PDF or Word: a subcontractor's, or yours before it goes out. KASQ checks it for 12 things a good RAMS needs and shows where each is in the document.
Is the task specific — what, where, when? Is supervision named? Is the method a step-by-step sequence? Do the hazards match the actual task? Do the controls follow the hierarchy, not PPE first? Is there a rescue plan for work at height? Are hazardous substances covered by COSHH? Do plant and equipment have inspection or certification arrangements? Are emergency arrangements there — first aid, fire, escalation? Is PPE specified for the task? Are monitoring and review arranged? How is the workforce briefed and signed on? KASQ does not decide whether the RAMS is acceptable — that is your judgement and your signature.
Upload the main contractor's construction phase plan (CPP) and site rules, then your RAMS. KASQ shows what matches, what is missing and what clashes, quoting both documents.
KASQ reads the pack and lists what it requires of your RAMS, then reads your RAMS and answers each point: covered, partly covered, missing, or in conflict — quoting the pack’s passage and the RAMS passage it found, or saying that none was found. Rules that are not about your task are set aside and named, and so is anything it could not check, every time. It never approves a RAMS. That is a competent person's judgement and signature; this shortens the read, it does not replace it.
Add the pack and your RAMS to turn this on.
Say the job in a sentence. KASQ reads what kind of work it is, asks you the few things only you know, and writes a RAMS from HSE good practice and CDM 2015 with the source on every control — then checks it the way it checks any RAMS, and you decide what to keep.
The draft is written from your own description, your answers and your Site register, against the same rulebook the RAMS review uses. Every control names the law, the approved code, the HSE guidance or KASQ's checklist it stands on; a control that cannot be tied to one is not printed. Anything nobody told it is a square-bracket gap, never a guess. It never approves a RAMS. The file is a working draft at revision 0.0 until a competent person has reviewed it, filled the brackets and signed it.
Say what is done, where, how you get to it, and what is not part of it. One or two sentences is enough; the next screen shows what was read from them.
The text you type here is read by an external AI provider in the United States and is not kept. How we handle your documents
Step 2 of 4 What kind of work this is, read from your sentence
Step 3 of 4 The things only you know
Step 4 of 4 Who does the work
Tick the people from your Site register. Their certificates and expiry dates go into the competence section as they stand — an expired card is printed as expired, for you to see before the main contractor does.
Reading the job costs 1, writing costs 10, the check that follows costs 5 — sixteen questions from your allowance for a checked draft.
The assessments you have saved, newest first. Open one to print it again, or to work it out again for a different job — a different amount, place or frequency.
The talks you have saved, newest first. Open one to print it again, or to put a different site, photo or logo on it and make it this week's talk.
Your RAMS by site, as you filed them. You write the labels and you say which one is current — KASQ keeps them and decides nothing about them.
This holds the version you gave us, on the day you gave it, with what the check found. It is not your controlled register. The approved copy lives on your own computer and in your client's system, and it keeps moving after we see it — so every document here shows the date it arrived. Nothing is ever refused: file the same revision twice, call it “Rev A”, label it in your own words.
Say what the job needs and see who holds it. Cards, trade, rate and how far they are from your site — no names, no numbers, no agency in the middle.
Every person here typed their own details and photographed their own cards. A card read from a photograph says read, and a card confirmed with the scheme that issued it says confirmed — the two are never the same word. An expired card counts as no card at all. KASQ never rates a person and never sorts them best-first. The order is distance from your site, then whoever has been looked at least.
You are never shown where somebody lives — only how far they are from the postcode you type. And nobody here is told which company looked at them.
Shown to anybody you ask for. An approach with no name on it is a stranger asking a worker to decide about work, so there is no anonymous option.
Only the first half is used, and only to work out a distance.
Somebody who only wants work of a month or more is not turned up by two days of it — and is not rung about it either.
Left at nothing, rate is not part of the search. A rate only ever compares like for like — an hourly figure is never turned into a daily one.
Upload the product's safety data sheet (SDS). KASQ reads the hazards and works out the control level HSE's way (COSHH Essentials). Then you add the task.
In the office. Drop in the product’s own safety data sheet. KASQ reads the parts that matter — the product, its composition, the hazards, the exposure controls and the physical properties — and checks every hazard code it found against the words on the sheet; a code it cannot find there stops the read. From those codes it puts the product in HSE’s hazard group and, with how much you use and how dusty or volatile it is, works out the control approach exactly as the COSHH essentials tables do — a look-up, not an opinion, and the more cautious cell where the tables disagree. Then you add the task: what is being done, where, by whom, how often and for how long, what controls are already there, and who is assessing. The sheet lists each constituent with its GB workplace exposure limit from EH40 where one is listed.
On site. The assessment is printed, in English, and kept where the product is used, with the data sheet beside it. It carries a line for the assessor and a line for the competent person who reviews and approves it — work starts after that signature, not before.
It never replaces the safety data sheet and never signs the assessment off. A data sheet describes a substance; an assessment describes your job, and the task you type is all KASQ knows about your site. It does not measure anybody’s exposure and does not choose a respirator. The data sheet is read and then deleted.
Fill in the header here — the crew writes the rest by hand at the work area.
In the office. Pick the site — every setting below belongs to it and is remembered for it. Pick the language its crew actually speaks: on most sites the people doing the work are not the people who wrote the paperwork, and a worker cannot sign to a hazard they cannot read. One sheet, one language — English, Polish, Romanian, Russian, Lithuanian or Bulgarian. Then shape the pad to the site: which columns the table carries (four layouts), whether sixteen or twenty people sign, your logo, and the hazard checklist on the back — type over any line to change it, empty it and it does not print. Fill in the header and the address the finished sheets come back to. The hazards, the controls and the signatures stay blank on purpose.
At the work area. The steps, the hazards, the controls and every signature are written by the people who walked the area, at the area — not at a desk before the shift. If the site asks for it, a fifth step prints: scan the code and send one photograph of the work area before the work starts, so whoever files the sheet can see the assessment was done where the work is. At the end of the shift the same code sends both sides of the finished sheet to the office, if the office keeps them.
It never fills in the sheet and never checks who did. The code on the paper is a request, not a lock — a sheet that arrives without a photograph is not refused. It is an address printed on paper so the pad has a way home.
Fill in the boxes here — the sheet below fills in as you type.
This checklist belongs to your site. Type over any heading or line to reword it, and empty one to take it off the sheet — it stays here, struck through, so you can put it back. Anything you leave alone prints in the language of the sheet.
This sheet has no return address. The code on it will open a page that cannot say where to send the photographs.
The PDF could not be built in this browser. Try again, or use another browser.
An audit is walked on a phone — open KASQ in the phone's browser, signed in, and the walk is in your pocket. This desk shows the same walks.
Who is on site, their certificates and expiry reminders — and the 3 Strikes conduct board: the crew reads it from the code on the wall, in its own language, and can change nothing.
In the office. One register per site. Put the crew on it by hand — one person a line, name and position — or upload the list you already have: Excel, CSV, Word or PDF. The names land in the box first for you to read and trim; nothing is written until you press Add crew. If the sheet is a training matrix, KASQ shows you the courses it carries but does not write them — a cell in a spreadsheet is a note about a certificate, not the certificate. Then drop each person’s certificates on their card, a folder at a time: PDFs, photographs, scans. KASQ reads the course and the expiry date and shows you what it read; fix anything it got wrong. Two scans of one card — front and back — join into one certificate. Search by name or position, filter by standing. Sixty days before a ticket runs out it turns amber on the register and on the tool’s tile; when it runs out, red. And the folder comes out whenever you want it: a training matrix as Excel — one row per person, one column per course, the expiry in the cell — with the certificates themselves beside it, to hand to an auditor or the main contractor. Strikes go in only if you tick the box that time; it is never ticked for you.
On the wall. Print the code and hang it in the cabin. The crew scans it and reads the 3 Strikes board in their own language — English, Polish, Romanian, Russian, Lithuanian or Bulgarian — finds their own name, and can change nothing. No login: the code itself is what guards the board, so whoever holds it can read it — hang it where only your own workforce sees it, and if the wrong person photographs it, make a new code and the old one stops working at once. A strike is recorded by the office: a level picked by the person recording it — warning, serious, or removed from site — with a note and a photograph. Three strikes and a worker is off the site; one serious act can be enough on its own. A withdrawn strike stays on the record as withdrawn.
It never decides a strike and never checks a certificate. It reads what is on the paper and shows you the page it read from; whether the paper is real, and whether a worker deserves the strike, is the office’s call.
Turn reports of thorough examination into a register your site can scan. A worker holds a sling, types its number, and reads whether it is in date — in their own language, with the certificate under it.
In the office. Drop in the reports of thorough examination — PDFs, photographs of the labels on the kit itself, or the register you already keep in Excel — as many times as you like, into one register. KASQ reads each page two ways where it can, tells you when it could only read it once, and shows you every row with the page it came from; nothing is published until you have looked. Publish, and you get a board for the wall with a QR code on it, a live register you can search and filter, the certificates on file behind every item, and a copy as Excel. Thirty days before an examination runs out, again at fourteen, and on the day, one email per register names the items — never one email per sling.
On site. A worker scans the board, types the number on the equipment, and reads whether it is in date — in English, Polish, Romanian, Lithuanian or Bulgarian — with the examiner's page under it. No account, no sign-in. If something looks wrong they say so, with a photograph; the note shows to the next person who types that number and lands on your screen. Only the office takes a thing out of service — and from that moment every phone on site reads OUT OF SERVICE — DO NOT USE. A site code, if you turn one on, asks for six characters before anything shows.
It never examines anything. A thorough examination is a competent person's work; this carries what they wrote and nothing more. A worker's report is a note, never a verdict. And the register never leaves this screen as a list: a phone answers the one number typed into it, and nothing else.
Live preview — this is the sheet, at A4.
Dashed lines on the corners and a mark for the hole. Cut the corners, laminate, then punch through the clear border so water cannot get into the paper. On by default here: this one hangs outdoors by definition.
Nothing is published until you have looked at this. Rows we are unsure of are marked — the count the report gives against the numbers we read, and any row carrying more than one date.
How long each tool can run in one person's hands in a day, using HSE's points system. Prints a board for the wall and a record card per worker.
In the office. Add the site's vibrating tools — from each tool's own manual, where KASQ reads the declared vibration figure and checks it, or typed in by hand. It works out how long each may run in one person's hands in a day using HSE's points system, rounding points up, never down. Type the site's name and the email the records should come back to, then print two things: a board for the wall with a QR code on it, and a weekly record card, one per worker.
On site. A worker scans the code and the page opens on their phone with those tools already on it, in English, Polish, Romanian, Lithuanian or Bulgarian. They tap what they used and for how long; the page adds up their points and tells them where they stand against the action value and the limit. One tap sends the day, as a one-page sheet in English, from their own phone to the address printed on the board.
It never measures a worker’s actual vibration exposure. It works from the tool's declared figure, and it is not health surveillance. Nothing the worker types reaches KASQ’s server — the record goes from their own phone to your office by their own mail or messaging app, so copies may stay on the phone and in those services, never with us.
A register too long to fit in a code a phone can read off a wall prints without one — split it by work area and make a board for each.
The PDF could not be built in this browser. Try again, or use another browser.
The PDF could not be built in this browser. Try again, or use another browser.
How much noise one person takes in a day, worked out HSE's way — the same points system as the hand-arm vibration tool.
Noise adds up on energy, not on decibels. Two hours at 91 dB(A), four at 85 and two at 78 is 86.9 dB(A) for the day — above the 85 dB(A) upper action value, where a plain average of the levels would read “under it”. That is unprotected exposure; the separate 87 dB(A) limit takes hearing protection into account.
Every 3 dB doubles the dose. 88 dB(A) uses the day’s allowance in half the time 85 does.
Where your numbers come from is recorded. Every entry carries its source — measured on site, or declared by the manufacturer under the Supply of Machinery (Safety) Regulations 2008 — and that source prints on the record.
What this cannot know. A manufacturer’s declared figure is measured at the operator in test conditions. It does not include the breaker running three metres away, or what a shaft or a basement does to the sound. Where exposure is near the values, HSE expects measurement. Add the work going on around you as its own entry, or measure.
Where the typical figures come from. The picker in each row offers HSE’s own published ranges for common site work. They are starting points, not measurements: the record marks them estimated until the level is checked on this site, with this tool, doing this job.
The 87 dB(A) limit value is not what this shows. Regulation 6 applies the limit to exposure at the ear, after hearing protection. This tool gives unprotected exposure. It will tell you how many decibels the protection has to remove; working out whether a particular protector does that needs its HML or octave-band data, which is HSE’s separate hearing protection calculator.
One row per task or machine. Use the level at the person’s ear in dB(A), and the time they are exposed to it — not the time the machine runs.
One A4 page with the day's tasks, where each level came from, the working, and a line to sign.
The PDF could not be built in this browser. Try again, or use another browser.
What a tool or component would do to someone below it - type what it weighs and how far it falls.
In the office or on the spot. Any tool, fitting or component that could fall on somebody — writing a RAMS, planning a lift, or standing under work at height and seeing no tethers on the tools. Type what the thing weighs and how far it could fall — or drag a finger across the chart and watch the numbers move. KASQ gives you the DROPS verdict for a person underneath: slight, minor, major or fatality, from the published DROPS Calculator (dropsforum.org, DROPS Asia Chapter), transcribed line for line and checked against its own worked examples. Beside it, the things that make a crew look up: how fast it arrives, and what it hits like — a cement bag, a motorbike, a family car — so a 1 kg fitting from 30 m stops being a number. Pin a result, change the weight or the height, and see the two side by side with the difference. Read it in English, Polish, Romanian, Russian, Lithuanian or Bulgarian, and download the report as a PDF, comparison included.
The zone. The suggested exclusion radius is a site rule of thumb — drop height ÷ 3, four metres minimum, rounded up to the half metre a worker can pace out. It takes no account of mass, wind, bounce or shape, and it is not the DROPS bounce-zone tool. Confirm it against your own RAMS before marking out a barrier.
It never allows for the object. No wind, no air resistance, no shape, no material — the source calculator does not either, and says so. Arrival speed assumes an object released from rest and falling under gravity alone; drag in still air makes the real speed lower, and the calculation does not model a throw, a push or the wind. Use it beside a risk assessment, not instead of one.
A general site rule of thumb - drop height ÷ 3, 4 m minimum where practicable. It takes no account of mass, wind, bounce or the shape of what's falling, and it is not the DROPS Excel bounce-zone tool. Confirm against your own RAMS before marking out a barrier.
Worked out with the DROPS Calculator formula (dropsforum.org, DROPS Asia Chapter): impact energy = mass × 9.80665 × drop height; severity comes from published height thresholds that vary by mass, not from the energy figure. It doesn't allow for wind, air resistance, shape or material - use it alongside a proper risk assessment, not instead of one.
Pick a sign, type your wording, print and laminate.
In the office. Pick one of 85 signs — prohibition, warning, mandatory, escape and first aid, fire, and the chemical hazard pictograms from the Classification, Labelling and Packaging rules, CLP — a black symbol on white inside a red diamond — which come from the product’s own label — or search them by what you need: hard hat, forklift, acid. Type the wording, or take one of the phrases sites actually buy; add a headline and your logo; turn it on its side; choose A4 or A3. Put several on one plate for a site board, drag them into order, take one out. The first aid poster takes your first aiders — name, phone, photograph — and prints blank lines where you have not decided yet. One click gives you a PDF laid out exactly as the preview, with cutting guides for laminating and, if you want it once, a page on how to cut and laminate.
On site. The sign goes on the fence, the door or the cabinet; the board at the gate; the poster where the first aid kit is. Cut and laminated the way the guide says, water stays out of the paper.
It never checks your wording. The templates use the standard safety-sign shapes and colours from HSE’s L64; the wording, the printed size, where the sign goes and whether it can be seen from there are yours to check. The wording is not checked: the right sign, the right place and the right control are your decisions. Nothing leaves your browser: the logo, the photographs and the finished PDF are made on this computer and never sent to us.
No signs match that. Try a shorter word, or . No ready-made sign for it? Every sign here takes your own headline and wording, several can share one plate, and the text board is a sign with no pictogram at all.
Logo added — it is used on every sign, board and poster here.
The logo stays in your browser — it is never uploaded.
You get a finished PDF, laid out exactly as the preview shows — print it at any size, or send it to site.
Dashed lines on the corners and a mark for the hole. Cut the corners, laminate, then punch through the clear border so water cannot get into the paper.
The PDF could not be built. Check your connection and try again.
A second sheet explaining the order, with the measurements. Worth printing once for whoever does the cutting — not with every sign.
Live preview — changes as you type.
Drag a row by its handle to change the order.
Logo added — it is used on every sign, board and poster here.
The logo stays in your browser — it is never uploaded.
You get a finished PDF, laid out exactly as the preview shows.
The PDF could not be built. Check your connection and try again.
The board no longer fits on one page — shorten some wording, or .
Dashed lines on the corners and a mark for the hole. Cut the corners, laminate, then punch through the clear border so water cannot get into the paper.
A second sheet explaining the order, with the measurements. Worth printing once for whoever does the cutting — not with every sign.
Live preview — changes as you type.
A blank slot prints as lines to fill in by hand — useful when the first aider on shift changes.
Logo added — it is used on every sign, board and poster here.
Names, phone numbers, photos and the logo stay in your browser — they are never uploaded, never stored and never leave this device.
You get a finished PDF, laid out exactly as the preview shows.
The PDF could not be built. Check your connection and try again.
The poster no longer fits on one page — remove a first aider or shorten the wording.
Dashed lines on the corners and a mark for the hole. Cut the corners, laminate, then punch through the clear border so water cannot get into the paper.
A second sheet explaining the order, with the measurements. Worth printing once for whoever does the cutting — not with every sign.
Live preview — changes as you type.
The wording is written and checked for you — edit it below if your site says it differently.
The photo and logo stay in your browser — they are never uploaded.
Live preview — changes as you type.