Enforcement puolicy for the iron mains risk reduction programme 2021-2026
Current. Last checked with HSE on 14 November 2026.
Guidance on HSE's website.
- Kind
- HSE web guidance, updated 13 January 2026
- HSE's date
- 13 January 2026
- Last checked
- 14 November 2026
The passage you were sent
What it says, in HSE's own words
This policy comes before the Enforcement Policy for the iron mains risk reduction programme 2026 to 2031 Background The Health and Safety Executive’s (HSE) enforcement policy for the Iron Mains Risk Reduction Programme (IMRRP) addresses the failure of ‘at risk’ iron gas mains (ie those pipes within 30 metres of buildings) and the consequent risk of injuries, fatalities and damage to buildings.
It is designed to secure public safety whilst allowing efficiency, environmental, strategic and customer service factors to contribute to driving the programme and allowing sufficient flexibility to enable the Office of the Gas and Electricity Markets (Ofgem) to incentivise innovation in risk management. Over the last 43 years various iron mains replacement programmes have been in place. Since 2002 the programmes have been designed to decommission all ‘at risk’ iron pipes within a 30-year period.
Quoted from HSE. Open the original on hse.gov.uk
Key points
This HSE policy covers the Iron Mains Risk Reduction Programme from 2021 to 2026, addressing the risks from ‘at risk’ iron gas mains, meaning pipes within 30 metres of buildings. It sets a three-tier approach based on pipe diameter: Tier 1 is 8 inches and below, Tier 2 is above 8 inches and below 18 inches, and Tier 3 is 18 inches and above. Operators must provide quarterly and annual monitoring information to HSE, and respond to public-reported gas escapes.
Our summary of the document's own words. Check the original before you rely on it.
Machine-translated summary (Polish)
Niniejsza polityka HSE obejmuje Program ograniczania ryzyka związanego z żeliwnymi głównymi przewodami gazowymi od 2021 do 2026 roku, odnosząc się do zagrożeń związanych z „zagrożonymi” żeliwnymi głównymi przewodami gazowymi, czyli rurami znajdującymi się w odległości 30 metrów od budynków. Ustanawia trzystopniowe podejście oparte na średnicy rury: Tier 1 to 8 cali i mniej, Tier 2 to powyżej 8 cali i poniżej 18 cali, a Tier 3 to 18 cali i więcej. Operatorzy muszą przekazywać HSE kwartalne i roczne informacje dotyczące monitorowania oraz reagować na zgłoszone przez społeczeństwo ulatnianie się gazu.
Machine-translated summary (Romanian)
Această politică HSE acoperă Programul de reducere a riscului asociat conductelor principale de gaz din fontă pentru perioada 2021-2026, abordând riscurile conductelor principale de gaz din fontă „cu risc”, adică țevile aflate la 30 de metri de clădiri. Stabilește o abordare pe trei niveluri bazată pe diametrul țevii: Tier 1 înseamnă 8 inci și mai puțin, Tier 2 înseamnă peste 8 inci și sub 18 inci, iar Tier 3 înseamnă 18 inci și mai mult. Operatorii trebuie să furnizeze HSE informații trimestriale și anuale privind monitorizarea și să răspundă la scăpările de gaz raportate de public.
Check your RAMS against this document
Related guidance
- Enforcement Policy for the iron mains risk reduction programme 2013 - 2021
- Enforcement Policy for the iron mains risk reduction programme 2026-2032
- Gas Distribution Networks Operators' approved risk reduction programmes: 2013 - 2017 and 2013 - 2021
- Investigating major gas fires and explosions
Tell me when HSE changes this
Tell me when HSE changes Enforcement puolicy for the iron mains risk reduction programme 2021-2026. A line in the Monday email when HSE withdraws, replaces, moves or updates this document, and no email when it does not.