
For site managers, supervisors and subcontractors on sites in Great Britain
Site safety paperwork, written from HSE guidance.
Toolbox talks and sign-on sheets in the crew's language. RAMS checked against HSE good practice.
or continue with
Free plan, no card. We email you a 6-digit code to sign in. Privacy notice
Or look inside first, no account →You are signed in.
Open KASQ- 1Name the task
- 2Pick the language
- 3Print the sheet
- 4The crew signs
Example. Talks in the crew's languages are part of Trade; on the free plan they print in English. See a finished sheet (PDF)
See it work
The paperwork you already do, with the slow part done.
More of the fourteen tools, shown as they run. The decisions stay with the competent person.
Site advisor
Ask a site safety question in plain English. The answer names its HSE source. Counts as 1 question.
Look inside Site advisor →- Reading your question…
- Searching Construction V1 sources…
- Writing the answer from the checked sources…
- Checking every claim against its source…
A scaffold used for construction work must be inspected before first use and then at intervals of no more than 7 days until it is removed.
It must also be inspected after substantial alteration or any event likely to affect its safety or stability, such as adverse weather or accidental damage.
Inspections must be carried out by a competent person, and the result must be recorded. A visible scaffold tag may supplement the inspection record but is not itself legally required.
- RAMS reviewA RAMS checked 12 ways before it goes to the main contractor. Each finding quotes the line behind it.
- Kit checkScan the board, type the number on the tag, read whether the kit is in date.
- Dropped object riskWhat a tool or component would do to someone below it. Type what it weighs and how far it falls.
- Site auditWalk the site with your phone. Photograph it, say what you see in your own language, move on. The PDF leaves before you do.
- Site signsPick a sign, type your wording, print and laminate.
A day on site
What a site writes down in a day
Talks, checks, walks and registers. Each point is one of them.
- Toolbox talk: Silica dust when cutting kerbs; sign-on sheet printed · 12 lines
- Kit check: Chain sling EL02; examination due in 14 days · office reminded
- Site audit: Edge protection, level 2 slab; fix closed with a photograph · 2 h ago
- RAMS review: First-fix cabling, ground floor; 2 missing · 1 vague · of 12 checks
- Noise: Cut-off saw, 92 dB(A) for 4 h; 89 dB(A) for the day · above the upper action value
- Vibration: Breaker at 14 m/s², 20 min; 131 points · above the action value
- COSHH: Switchgear degreaser; hazard group and controls · ready to sign
- Site register: Telehandler ticket; runs out in 21 days · shown amber
- Take 5: Pad for the loading bay crew; one language per pad · 16 sign lines
- Dropped object: 2.5 kg from 12 m; exclusion zone 4.0 m
- Site signs: Hard hats must be worn; A3 board · ready to print
- Site advisor: How often must a scaffold be inspected?; answer with its HSE source named
- Kit check: Ladder L-07 taken out of service; a scan on site reads DO NOT USE
- CPP check: Drylining RAMS against the pack; 2 missing · 1 in conflict
- Site audit: Walk 14 · 9 photographs; 2 open · 1 late
- Toolbox talk: Working at height on podium steps; printed in the crew's language
- Kit check: Harness H-114; looked up on site · IN DATE
- Site register: CSCS cards; 41 in date · 2 expiring
Everything in it
Fourteen tools, three kinds of work.
Documents 6 tools
- Toolbox talksFrom HSE guidance, in the crew's language
- RAMS reviewChecked 12 ways
- Build a RAMSA first draft from one sentence
- CPP compatibilityYour RAMS against the plan
- COSHH assessmentFrom the safety data sheet
- Site advisorAnswers with their HSE source
On site 5 tools
- Take 5 / POWRAPoint-of-work risk assessment
- Kit checkEquipment register, by QR
- Site registerCrew, certificates, 3 Strikes
- Site auditA walk, photos, a PDF
- Site signs85 signs to print
Calculators 3 tools
- Hand-arm vibrationHSE's points
- Noise exposureThe day added up
- Dropped object riskWeight and height in
Two hours at 91 dB(A) and the day is already at 85. A 2 kg hammer from 12 metres: about 235 joules.
The crew's pages speak Polish, Romanian, Lithuanian and Bulgarian, and Russian on talks and Take 5. The office works in English.
News
New sites near you, every Monday.
Who is building, when it starts, what changed.
Nothing is sent until you click it.
No mail after a few minutes? Check spam. We send at most three confirmation mails a day to one address, and none if it already gets these alerts.
While you wait: Start free →
Where it stops
What we will not do.
Invent a number
Where the guidance gives no figure, KASQ says so. An estimate is always marked as one.
Sign for you
No tool here approves a RAMS or signs off a COSHH assessment. The judgement stays with the competent person.
Hide the source
Every talk and every answer names the HSE document it came from, on the page the crew signs.
Prices
Start free. Pay the month you need more.
30 questions a month · 1 person · 2 site audits a month
500 questions a month · up to 3 people · your logo on every PDF
1,500 questions a month · up to 10 people · the CPP check
No card, no sales call, no clock on the free plan. Compare plans and see how a question is counted
Questions
Before you start.
Is this legal advice?
KASQ is guidance, not a duty holder. Answers come from HSE guidance and legislation with their sources shown; your site rules, your RAMS, your permits and a competent person come first.
What happens to my documents?
We do not sell anything to anybody. There are no advertising or analytics companies in this product. Your company's records stay your company's: we only hold them and do as we are told.
Which languages does the crew get?
The crew's pages speak Polish, Romanian, Lithuanian and Bulgarian, and Russian on talks and Take 5. The office works in English. Toolbox talks in the crew's languages are part of Trade and Company; on Free they are in English.
What is a question, and what if I run out?
A question is counted only when KASQ does work for you: an answer, a document review, a cross-check. The count starts again on the 1st of each month. Your saved talks, registers and the free tools still work.
Can I stop paying?
Cancel whenever you like. Your records do not go when your plan does. Free stays free: no card, no trial that turns into a bill.
Make tomorrow morning's talk tonight.
Free plan, no card. Looking needs no account.
Start free Look inside first